Langley Industrial Park — Republic Drive Annexation
Langley Industrial Park is a 6.24-acre voluntary annexation into the City of Groveland — Lot 5 on Republic Drive at the southwest corner of Democracy Street and Republic Drive. The applicant is Trevor P. Browne on behalf of property owner Rutland International, Inc. (10895 Rocket Blvd, Orlando, FL 32824); civil engineering by Larry Poliner, P.E., RCE Consultants, LLC. The May 7, 2026 P&Z Board agenda runs the standard three-ordinance template — Ordinance 2026-5 (annexation), Ordinance 2026-6 (small-scale CPA, Lake County Industrial / Urban-Low → Groveland Employment Center), Ordinance 2026-7 (rezoning to Groveland Light Industrial). The proposed use is a 100,000 sq ft light industrial office/warehouse. Rutland International is also branded as rollformerusa.com — rolled-metal forming. Together with the Gadson Street annexation in November 2025 (1.9 acres, identical template), Langley confirms the industrial-employment edge expansion pattern: two parcels, six months apart, identical procedural posture, deliberate industrial-base growth along the Christopher C. Ford Commerce Park corridor.
The case file
Three instruments comprise the Langley Industrial Park entitlement package:
- Ordinance 2026-5 — voluntary annexation of 6.24± acres into the City of Groveland
- Ordinance 2026-6 — small-scale Comprehensive Plan Amendment from Lake County Industrial / Urban-Low to City of Groveland Employment Center
- Ordinance 2026-7 — rezoning to City of Groveland Light Industrial
Location: Lot 5, Langley Industrial Park (Plat Book 63, Pages 48-49); Parcel 30-21-25-1000-000-00500; Alt. Key 3871824. Republic Drive at the southwest corner of Democracy Street and Republic Drive. Lot 5 is fully surrounded by Employment Center and Light Industrial uses on three sides and Industrial on the south.
The applicant and the use
- Applicant: Trevor P. Browne, on behalf of property owner Rutland International, Inc. (10895 Rocket Blvd, Orlando, FL 32824)
- Civil engineer: Larry Poliner, P.E., RCE Consultants, LLC
- Proposed use: 100,000 sq ft light industrial office / warehouse
- Notable Decoder read: Rutland International is also branded as rollformerusa.com — rolled-metal forming. Suggests metal-products / building-products manufacturing or distribution as the underlying use.
The pattern confirmation
Langley Industrial is the second confirmed industrial annexation in six months at Groveland, on the identical three-ordinance template as Gadson Street (Ordinances 2025-29 / 2025-30 / 2025-31, November 6, 2025, 1.9 acres). Two parcels, six months apart, identical procedural posture:
- annex from Lake County
- small-scale CPA from Lake County Industrial / Urban-Low to Groveland Employment Center
- rezone to Groveland Light Industrial
The template scales from 1.9 acres (Gadson) to 6.24 acres (Langley) without procedural friction. Both Gadson and Langley operate against the same Comp Plan Policy 1.1i — staff cite "Employment Centers such as the Christopher C. Ford Commerce Park shall…" as the framing. Christopher C. Ford Commerce Park is Groveland's existing employment-center anchor; both Gadson and Langley are slotted into the same typology.
Why the entity matters for the corpus
Langley confirms a deliberate industrial-base expansion strategy, not isolated transactions. The signal compounds with Brighthill Phase 2 — both ran the same procedural template, both are the same city-jurisdiction expansion mechanism, but Brighthill expanded the Village identity (147 acres) and Langley expanded the industrial edge (6.24 acres). Two opposing-direction expansion strategies running in parallel on the same procedural template, often in the same meeting cycles. The risk is the gap: the Village rezonings are larger and more identity-defining than the industrial ones, but the industrial ones generate the tax base and jobs that pay for the Village ambition.
For developers and operators: voluntary annexation of contiguous Lake County industrial-zoned land into Groveland Light Industrial is now a recurring, frictionless workflow. The next industrial annexation will likely follow the same template. Watch the May 7, 2026 vote, the City Council second readings, and the next industrial parcel along Republic Drive.
Bidirectional links across the corpus
- Groveland PZB May 7, 2026 — three-ordinance Langley package on agenda
- Groveland City Synthesis — Industrial-employment edge expansion pattern